Overlap Interleave Rolling Garbage Bag Making Machine Drawstring Bag Making Machine Draw Tape Bag Making Machine
Product Details
| Customization: | Available |
|---|---|
| Warranty: | 1 Year |
| Product Line: | 1 Line |
Manufacturer/Factory & Trading Company
360° Virtual Tour
Secured Trading Service
Diamond Member Since 2007
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Importers and Exporters
High Repeat Buyers Choice
Years of Export Experience
Fast Delivery
The supplier has import and export rights
More than 50% of buyers repeatedly choose the supplier
The export experience of the supplier is more than 10 years
The supplier can deliver the goods within %s days
Sign In to see all verified strength labels (24)
Find Similar Products
Basic Info.
- Model NO.
- GBBCR III
- Lines
- 1
- Voltage
- 380V/220V
- Seals Mode
- Hot Seal Perforation
- Speed
- High
- Continuous-Rolled
- Yes
- Sealing & Cutting
- Hot Seal Perforation
- Layer
- Double
- Machine Type
- Bag Forming Machine
- Computerized
- Computerized
- Type
- Plastic Bag Making Machine
- Bag Making Methods
- Rolling Bag
- Bag Making Length
- 100-1000mm
- The Kinds of Bag Making
- Color Printing Bag; White Bag
- Dimension of The Machine
- 11500*2100*2200mm
- Bag Making Width
- 300-850mm
- Total Power
- 18kw
- Machine Inverter Brand
- Made in China
- After-Sale Service Provided
- Engineers Available to Service Machinery Overseas
- Function
- Non-Snap Bag on Roll
- Transport Package
- Wrapping Film Packing or Packed in Wooden Case
- Specification
- CE, ISO9001: 2008, SGS, TUV
- Trademark
- SILSTAR
- Origin
- Made in China
- HS Code
- 84778000
Product Description
1. Main control panel adopts touch screen Delta from Taiwan, high definition
2. The drive system of the whole machine adopts PLC Microcomputer control (Single Chip control system ) on the punch machine which integrates control of bag making part and punching part.
3. Set all functions with one touch screen, simple and easy operation.
4. Machine will automatically stop if film jammed which is detected by the sensor
5. Independent winder part, high efficient unwind control; max diameter of single unwinding is 800mm; unwinding roller is choked by air shaft,
6. Automatic fold function and put on conveyor unit by unit.
7. Automatic stacks the bag and collects.
8. When the bags stack at the Set numerical, mechanical hands will automatically grab bags and the machine will not stop.) on punch machine which integrates control of bag making part and punching part.
2. The drive system of the whole machine adopts PLC Microcomputer control (Single Chip control system ) on the punch machine which integrates control of bag making part and punching part.
3. Set all functions with one touch screen, simple and easy operation.
4. Machine will automatically stop if film jammed which is detected by the sensor
5. Independent winder part, high efficient unwind control; max diameter of single unwinding is 800mm; unwinding roller is choked by air shaft,
6. Automatic fold function and put on conveyor unit by unit.
7. Automatic stacks the bag and collects.
8. When the bags stack at the Set numerical, mechanical hands will automatically grab bags and the machine will not stop.) on punch machine which integrates control of bag making part and punching part.
| Bag Width | 1000 mm |
| Bag Length | 900 mm |
| Film thickness | 10-50 µm per layer |
| Unwinder Film Size | 1000mm x Φ 600mm |
| Bag making Speed | 150 m/min |
| Roll Change Speed | Max. 10 pcs |
| Width of Draw Tape | 100 mm |
| Draw Tape Roll Diameter | 600 mm |
| Roll Width | 300 mm |
| Roll Diameter | Φ 150 mm |
| Total Power | 25 KW |
| Air consumption | 5HP |
| Machine Weight | 3800KG |
| Machine Dimension | L15000*W2000*H2100 mm |
Silstar machinery founded in 1997, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. Our products including:
1.Plastic T-shirt Bag Making Machine
2.Vegetable Bag on Roll Making Machine With Core
3.Garbage Bag Making Machine Coreless
4.Draw Tape Garbage Bag on Roll Making Machine
5.Plastic Film Blowing Machine
There are more than 54 countries and regions cooperating with us, such as Malaysia, Russia, Iran, Saudi Arabia, Peru, Algeria, Vietnam, India, Romania, America, etc.
1.Plastic T-shirt Bag Making Machine
2.Vegetable Bag on Roll Making Machine With Core
3.Garbage Bag Making Machine Coreless
4.Draw Tape Garbage Bag on Roll Making Machine
5.Plastic Film Blowing Machine
There are more than 54 countries and regions cooperating with us, such as Malaysia, Russia, Iran, Saudi Arabia, Peru, Algeria, Vietnam, India, Romania, America, etc.
SILSTAR Workshop Pictures:


| 1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
| 2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
| 3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
| 4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
| 5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
| 6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
| 7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
| 8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
| 9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
| 10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |
Send your message to this supplier
People who viewed this also viewed
Find Similar Products By Category
- Supplier Homepage
- Products
- plastic garbage bag making machine
- Interleave bag on roll making machine
- Overlap Interleave Rolling Garbage Bag Making Machine Drawstring Bag Making Machine Draw Tape Bag Making Machine
Related Categories
Hot Searches
More