| Customization: | Available |
|---|---|
| Warranty: | 1 Year |
| Product Line: | Bag Making Machine |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Model | GBDR-300*2 |
| Bag Width | 100mm - 300 mm |
| Bag Length | 200mm - 1000 mm |
| Film thickness | 10-35µm per layer |
| Production Speed | 80-100m/min x2lines |
| Max. Diameter of rewind roll | 150mm |
| Film Unwind Diameter | Φ900mm |
| Total Power | 13KW |
| Air consumption | 5.5HP |
| Machine Weight | 3200KG |
| Machine Dimension | 6500x2400x2100mm |
Other machine you may interested:
1.Film blowing machine
2.Garbage Bag making machine
3.Bag with Core making machine
4.Recycle machine
5. interleave bag making machine
Silstar machinery founded in 1997, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. Our products including:
1.Plastic T-shirt Bag Making Machine
2.Vegetable Bag on Roll Making Machine With Core
3.Garbage Bag Making Machine Coreless
4.Draw Tape Garbage Bag on Roll Making Machine
5.Plastic Film Blowing Machine
There are more than 54 countries and regions cooperating with us, such as Malaysia, Russia, Iran, Saudi Arabia, Peru, Algeria, Vietnam, India, Romania, America, etc.


| 1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
| 2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
| 3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
| 4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
| 5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
| 6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
| 7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
| 8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
| 9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
| 10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |