• Gbzr-700 Side Folding &Forming Machine
  • Gbzr-700 Side Folding &Forming Machine
  • Gbzr-700 Side Folding &Forming Machine
  • Gbzr-700 Side Folding &Forming Machine
  • Gbzr-700 Side Folding &Forming Machine
  • Gbzr-700 Side Folding &Forming Machine

Gbzr-700 Side Folding &Forming Machine

Warranty: 1 Year
Computerized: Computerized
Automatic Grade: Automatic
Forming Width: 200-700mm
Dimension of The Machine: 3000*1800*1750mm
Total Power: 1.8kw
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2007

Suppliers with verified business licenses

Jiangsu, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (24)
  • Overview
  • Company Profile
  • Certifications
  • Packaging & Shipping
  • Exhibition
  • FAQ
Overview

Basic Info.

Model NO.
GBZR-700
Forming Speed
10-70m/Minute
Total Weight
650kg
Machine Inverter Brand
Made in Taiwan
Certificate
Ce, ISO9001: 2008, SGS,TUV
Machine Color
According to Client′s Requirement
Machine Brand
Silstar
Guarantee
One Year
Transport Package
Wrapping Film Packing or Packed in Wooden Case
Specification
CE, ISO9001: 2008, SGS
Trademark
SILSTAR
Origin
China Mainland(Jiangyin)
HS Code
84778000

Product Description

Features:
This machine have function of plastic sheet folding, packing pearl film, ultrasonic embossing line, automatic tape and EPC system and in the unwiner, we use magnetic tension controller. This machine have reliable performance and easy to operate it.
Machine brand: SILSTAR
Parameters:
Model GBZR-500 GBZR-700 GBZR-900
Forming  Width(mm) 200-500mm 300-700mm 400-900mm
Speed 70m/min 70m/min 70m/min
Power 1.5kw 1.8kw 2.5kw
Dimension of the machine 2800×1500×1750mm 3000×1800×1750mm 3200×2000×1750mm
Weight 500kg 650kg 800kg

 
 

Company Profile

Gbzr-700 Side Folding &Forming Machine
Silstar machinery founded in 1997, covers an area of 32,000 m2, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.

SILSTAR Workshop Pictures:
Gbzr-700 Side Folding &Forming MachineGbzr-700 Side Folding &Forming Machine
 

Certifications

Gbzr-700 Side Folding &Forming Machine
Gbzr-700 Side Folding &Forming Machine
Gbzr-700 Side Folding &Forming Machine

 

Packaging & Shipping

Gbzr-700 Side Folding &Forming Machine

 

Exhibition

Gbzr-700 Side Folding &Forming Machine

FAQ

1. Q: How long will your engineer reach our factory?

A: Within 7-15 days after the machine arrives at your factory.
2. Q: How many days will you finish installing?

A: We will finish installation and training within 3-7 days.
3. Q: What should we charge for your engineer?

A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person.
4. Q: How long is your machine's warranty period?

A: All our machines have one year guarantee, starting from the finished installation.
5. Q: How could we do after one year warranty period?

A: We also can do service for you, but you need to pay the salary for my technician 100USD/day.
6. Q: How could we do if the parts are broken within the warranty?

A: We would express the free replacement parts during the warranty date.
7. Q: Does your engineer understand English?

A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience.
8. Q: How many workers do we need to run those machines?

A: Usually need one person to operate the machine.
9. Q: How do we solve the machine problem after your engineer leaves?

A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description.
10. Q: How can I visit your company?

A: It takes 30 minutes by train from Shanghai to our factory.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now