Customization: | Available |
---|---|
Warranty: | 1 Year |
Lines: | 1 |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The garbage bag making machine is suitable to process cannular HDPE, LDPE or colorful flat bags, folding to the general bag size.
The garbage bag making machine adopts servo motors, Taiwan's original controller, stable process, and convenient operation.
It is highly accurate to fold the bag and control the filling, with no manual sorting.
Folding the flat bag to three folds(big bag turns into a small bag)
This making garbage bag machine absorbs the advantage of the foreign machines, offering the cold cutting bag production progress. This kind of bag making machine is the domestic leading machine.
Model | GBZD-800 | GBZD-900 | GBZD-1000 |
Film width | ≤700mm | ≤800mm | ≤900mm |
Film length | 650-1000mm | 650-1000mm | 650-1000mm |
Film thickness (mm) | 0.01-0.10mm | 0.01-0.10mm | 0.01-0.10mm |
Making bag speed | 40-60pcs/min | 40-60pcs/min | 40-60pcs/min |
Power supply | 3 phase 380v | 3 phase 380v | 3 phase 380v |
Main motor power(KW) | 3.8kw | 3.8kw | 4.2kw |
Main motor heating power(KW) | 2kw | 2kw | 2.2kw |
Overall dimension | 4200X1500X1600mm | 4200X1500X1600mm | 4200X1600X1600mm |
Weight | 1900kg | 1900kg | 2100kg |
SILSTAR workshop pictures:
1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |