Customization: | Available |
---|---|
After-sales Service: | Engineer Can O Abroad for Installation |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment methods: | |
---|---|
Support payment in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introducing Silstar's Automatic Drawstring Bag Making Machine, designed by Jiangyin Guibao Rubber & Plastics Machinery Co., Ltd. This state-of-the-art machine is revolutionizing bag production with its newly designed and stable rolling system, eliminating the need for manual rolling and significantly improving production efficiency.
Our Automatic Drawstring Bag Making Machine is capable of producing high-density polyethylene (HDPE) and low-density polyethylene (LDPE) drawstring/draw tape bags. With the added feature of a photocell, this machine effortlessly handles both printed and white bags with ease.
In today's market, where raw material costs are on the rise, many plastic bag manufacturers are incorporating recycled materials or CaCO3 into their granules. This can result in a film that is harder to seal. However, Silstar's seal knife is specifically designed to securely seal films that contain recycled materials and CaCO3, ensuring a strong and reliable seal every time.
Items
|
GBBCR-800
|
GBBCR-1000
|
GBBCR-1200
|
Lines
|
One deck, one line
|
One deck, one line
|
One deck, one line
|
Bag width
|
500-700mm
|
500-900mm
|
500-1000mm
|
Bag length
|
500-730mm
|
120-930mm
|
500-1000mm
|
Bag thickness
|
0.006-0.035mm
|
0.006-0.035mm
|
0.006-0.035mm
|
Output one
|
100-150pcs/min
|
100-130pcs/min
|
100-120pcs/min
|
Total Power
|
12kw
|
13kw
|
14kw
|
Model name
|
Rolling draw tape bag making machine
|
Final product
|
Draw tape bag
|
Application
|
Draw tape bag,printed or unprinted draw tape garbage bag
|
Material
|
HDPE,LDPE,Recycled material,CACO3 added
|
Bag length
|
500-1000mm
|
Bag width
|
500-1000mm
|
Output
|
50-150pcs/min
|
Unwinder way
|
Motor driver control
|
Servo
|
Taiwan TECO *2
|
Inverter
|
Taiwan TECO
|
Air cylinder
|
Taiwan AirTAC
|
Delivery time
|
30-60 days
|
Warranty
|
1 year
|
Technical Assistance
|
Engineers are avilable service machine oversea
|
Optional device
|
Automatic paper core change device
|
Other machine you may interested:
1.Film blowing machine
2.Coreless Bag making machine
3.Bag with Core making machine
4.Recycle machine
1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |