• Double Lines Glove Making Machine
  • Double Lines Glove Making Machine
  • Double Lines Glove Making Machine
  • Double Lines Glove Making Machine
  • Double Lines Glove Making Machine
  • Double Lines Glove Making Machine

Double Lines Glove Making Machine

Warranty: 1 Year
Product Line: 2 Lines
Lines: 2
Voltage: 220V/380V
Speed: High
Continuous-Rolled: No
Customization:
Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Company Profile
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Certifications
  • Packaging & Shipping
  • Exhibition
  • FAQ
Overview

Basic Info.

Model NO.
GBA-500 II
Sealing & Cutting
Heat-Sealing Cold-Cutting
Layer
Double
Machine Type
Bag Forming Machine
Computerized
Computerized
Type
Plastic Bag Making Machine
Temperature Controller
Made in Taiwan
Servo Motor
Made in Taiwan
Machine Inverter Brand
Made in Taiwan
Guarantee
One Year
Bag Making Methods
Rolling Bag
Machine Control
Computer Box
Kinds of Bag
Rolling T-Shirt Bag ,Rolling Flat Bag
Bag
Disposable Plastic Glove
Material
PE
After-Sale Service Provided
Engineers Available to Service Machinery Overseas
Transport Package
Wrapping Film Packing or Packed in Wooden Case
Specification
CE, ISO9001: 2008, SGS, TUV
Trademark
SILSTAR
Origin
China Mainland(Jiangyin)
HS Code
84778000

Product Description

 

Company Profile

Double Lines Glove Making Machine
Silstar machinery founded in 1997, covers an area of 32,000 m2, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.

Product Description

1. Double unwind, double line glove making
2. The whole machine PLC control with touch screen operation which is convenient
3. Servo motor driving which is more stable
4. Glove sealing by heat sealing knife, temperature automatic and constant control
5. Automatic counting, alarming, and stop
6. Also can make automatic splitting
, the finished product is the complete glove, no need to split
7. Glove module can be customized
 
Double Lines Glove Making Machine

Product Parameters

Model GBA-400
Material PE
Material thickness 10-40um
Glove width 260-300mm
Glove length 200-350mm
Max speed 400 pcs/min
Power 15kw
Voltage 220V 50HZ 1 phase
Dimension 5960*900*1560mm
Dimension after wooden packing 1. 2800*1100*1760mm
2. 2560*1030*1700mm
Net weight 1400kg
Gross weight 1600kg

Detailed Photos

Double Lines Glove Making Machine
Double Lines Glove Making Machine
Double Lines Glove Making Machine

Certifications

Double Lines Glove Making Machine
Double Lines Glove Making Machine
Double Lines Glove Making Machine

Packaging & Shipping

Double Lines Glove Making Machine
 

Exhibition

Double Lines Glove Making Machine

FAQ

1. Q: How long will your engineer reach our factory?

A: Within 7-15 days after the machine arrives at your factory.
2. Q: How many days will you finish installing?

A: We will finish installation and training within 3-7 days.
3. Q: What should we charge for your engineer?

A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person.
4. Q: How long is your machine's warranty period?

A: All our machines have one year guarantee, starting from the finished installation.
5. Q: How could we do after one year warranty period?

A: We also can do service for you, but you need to pay the salary for my technician 100USD/day.
6. Q: How could we do if the parts are broken within the warranty?

A: We would express the free replacement parts during the warranty date.
7. Q: Does your engineer understand English?

A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience.
8. Q: How many workers do we need to run those machines?

A: Usually need one person to operate the machine.
9. Q: How do we solve the machine problem after your engineer leaves?

A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description.
10. Q: How can I visit your company?

A: It takes 30 minutes by train from Shanghai to our factory.

Send your message to this supplier

*From:
*To:
avatar Ms. Linda Wang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now