Customization: | Available |
---|---|
Warranty: | 1 Year |
Packaging: | Bag |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Bag Width | 1000 mm |
Bag Length | 900 mm |
Film thickness | 10-50 µm per layer |
Unwinder Film Size | 1000mm x Φ 600mm |
Bag making Speed | 150 m/min |
Roll Change Speed | Max. 10 pcs |
Width of Draw Tape | 100 mm |
Draw Tape Roll Diameter | 600 mm |
Roll Width | 300 mm |
Roll Diameter | Φ 150 mm |
Total Power | 25 KW |
Air consumption | 5HP |
Machine Weight | 3800KG |
Machine Dimension | L15000*W2000*H2100 mm |
1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |