| Customization: | Available |
|---|---|
| After-sales Service: | 1 |
| Warranty: | 1 Year |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High Efficiency: Production speed up to 150 pcs/min, significantly reducing labor costs.
Precision Control: Equipped with Taiwan TECO Servo Motors and PLC, ensuring +/- 1mm cutting accuracy.
Material Versatility: Supports HDPE, LDPE, and Recycled Materials (including CaCO3 fillers).
Durable Sealing: Advanced heat-sealing technology ensures the drawstring area is explosion-proof and leak-proof.
User-Friendly: Digital touchscreen interface, supports quick size changeovers
40+ Years Experience: Professional manufacturer of rubber & plastic machinery.
CE & ISO Certified: Fully compliant with international safety and quality standards.
After-Sales Guarantee: Engineers available for overseas installation and 24/7 online technical support.
|
Items
|
GBBCR-800
|
GBBCR-1000
|
GBBCR-1200
|
|
Lines
|
One deck, one line
|
One deck, one line
|
One deck, one line
|
|
Bag width
|
300-600mm
|
300-850mm
|
500-1000mm
|
|
Bag length
|
120-700mm
|
120-900mm
|
120-1000mm
|
|
Bag thickness
|
0.008-0.035mm
|
0.008-0.035mm
|
0.008-0.035mm
|
|
Output one
|
100-150pcs/min
|
100-150pcs/min
|
100-120pcs/min
|
|
Total Power
|
22kw
|
23kw
|
24kw
|
|
Model name
|
Rolling draw tape bag making machine
|
|
Final product
|
Draw tape bag
|
|
Application
|
Draw tape bag,printed or unprinted draw tape garbage bag
|
|
Material
|
HDPE,LDPE,Recycled material,CACO3 added
|
|
Bag length
|
120-1000mm
|
|
Bag width
|
50-1000mm
|
|
Output
|
50-120pcs/min
|
|
Unwinder way
|
Motor driver control
|
|
Servo
|
Taiwan TECO *2
|
|
Inverter
|
Taiwan TECO
|
|
Photocell
|
Japan panasonic
|
|
Delivery time
|
30-60 days
|
|
Warranty
|
1 year
|
| Customized Service |
Engineers are avilable service machine oversea
|
|
Optional device
|
Automatic paper core change device
|
Other products:
Other machine you may interested:
1.Film blowing machine
2.Garbage Bag making machine
3.Bag with Core making machine
4.Recycle machine
5. interleave bag making machine
Silstar machinery founded in 1997, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. Our products including:


| 1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
| 2. Q: How many days will you finish installing? A: We will finish installation and training within 3 days. |
| 3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
| 4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
| 5. Q: Can the machine handle printed film? A: Yes, it is equipped with a high-precision photocell for printed bag tracking. |
| 6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
| 7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
| 8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
| 9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
| 10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. 11.Q: What is the lead time? A: Standard models take 30-45 days. |