| Customization: | Available |
|---|---|
| Warranty: | 1 Year |
| Product Line: | 1 Line |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Bag Width |
1000 mm |
Bag Length |
1000 mm |
Film thickness |
10-50 µm per layer |
Unwinder Film Size |
1000mm x Φ 800mm |
Bag making Speed |
120 m/min |
Roll Change Speed |
Max. 10 pcs |
Width of Draw Tape |
100 mm |
Material |
PE |
Roll Width |
275 mm |
Roll Diameter |
Φ 150 mm |
Total Power |
55 KW |
Air consumption |
10HP |
Machine Weight |
8800KG |
Machine Dimension |
L12000*W2000*H2100 mm |
| Optional device 1 | Embossing roller |
| Optional device 2 | Automatic paper label machine |

Other hot sale machines
Other machine you may interested:
1.Film blowing machine
2.Garbage Bag making machine
3.Bag with Core making machine
4.Recycle machine
5. interleave bag making machine


| 1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
| 2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
| 3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
| 4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
| 5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
| 6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
| 7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
| 8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
| 9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
| 10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |