Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine

Product Details
Customization: Available
Warranty: 1 Year
Lines: 2
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2007

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Fast Delivery
The supplier can deliver the goods within 30 days
to see all verified strength labels (24)
  • Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine
  • Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine
  • Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine
  • Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine
  • Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Company Profile
  • Certifications
  • Packaging & Shipping
  • Exhibition
  • FAQ
Overview

Basic Info.

Model NO.
GBDR
Continuous-Rolled
Yes
Layer
Double
Computerized
Computerized
Type
Plastic Bag Making Machine
Function
Food Packing Bag
Bag Methods
Food Bag
Transport Package
Stretch Film
Trademark
SILSTAR
Origin
Made in China
HS Code
84778000
Production Capacity
600PCS/Min

Product Description

Product Description


These machines are heat sealing and heat cutting bag making machine, which are suit for printing and non-printing bag making. The material of bag is HDPE, LDPE.

Bag-on-roll with paper&pvc core production. Its automatic film-break and core-change function help bag suppliers to improve bag making capacity and to reduce energy and man power at the most extent.Its double servo motors control system makes producing more stable. It is the best choice for making bottom sealing printed bags and blank bags.
 
Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine

 

Product Parameters

Model GBDR-300*2
Bag Width 100mm - 360 mm
Bag Length 200mm - 1000 mm
Film thickness 10-35µm per layer
Production Speed 80-100m/min x2lines
Max. Diameter of rewind roll 150mm
Film Unwind Diameter Φ900mm
Total Power 13KW
Air consumption 5.5HP
Machine Weight 3200KG
Machine Dimension 6500x2400x2100mm
 

Detailed Photos

Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine
Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine
Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine

Company Profile

Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine
Silstar machinery founded in 1997, covers an area of 32,000 m2, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.
SILSTAR Workshop Pictures:
Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine
 Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine

 

Certifications

Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine
Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine
Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine

 

Packaging & Shipping

Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine

 

Exhibition

Disposable Garbage Bag on Roll with Core Coreless Bag on Roll Plastic Biodegradable Rolling Bag Making Machine

FAQ

1. Q: How long will your engineer reach our factory?

A: Within 7-15 days after the machine arrives at your factory.
2. Q: How many days will you finish installing?

A: We will finish installation and training within 3-7 days.
3. Q: What should we charge for your engineer?

A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person.
4. Q: How long is your machine's warranty period?

A: All our machines have one year guarantee, starting from the finished installation.
5. Q: How could we do after one year warranty period?

A: We also can do service for you, but you need to pay the salary for my technician 100USD/day.
6. Q: How could we do if the parts are broken within the warranty?

A: We would express the free replacement parts during the warranty date.
7. Q: Does your engineer understand English?

A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience.
8. Q: How many workers do we need to run those machines?

A: Usually need one person to operate the machine.
9. Q: How do we solve the machine problem after your engineer leaves?

A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description.
10. Q: How can I visit your company?

A: It takes 30 minutes by train from Shanghai to our factory.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now