• Center Fold T-Shirt Bag Making Machine
  • Center Fold T-Shirt Bag Making Machine
  • Center Fold T-Shirt Bag Making Machine
  • Center Fold T-Shirt Bag Making Machine
  • Center Fold T-Shirt Bag Making Machine
  • Center Fold T-Shirt Bag Making Machine

Center Fold T-Shirt Bag Making Machine

Warranty: 1 Year
Lines: 1
Voltage: 220V/380V
Speed: High
Continuous-Rolled: No
Sealing & Cutting: Heat-Sealing Cold-Cutting
Customization:
Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Company Profile
  • Certifications
  • Packaging & Shipping
  • Exhibition
  • FAQ
Overview

Basic Info.

Model NO.
GBZD-600
Layer
Double
Machine Type
Bag Making Machine
Computerized
Computerized
Type
Plastic Bag Making Machine
Machine Inverter Brand
Made in Taiwan
Servo Motor
Made in Taiwan
Temperature Controller
Made in Taiwan
Guarantee
One Year
Bag Making Methods
Center Fold Bag
Optional Equipment
EPC
Loading
Two Air Cylinders
Machine Control
PLC ,Touch Screen
Certificate
CE, ISO9001: 2008, SGS,TUV
Transport Package
Wrapping Film Packing or Packed in Wooden Case
Specification
1800kg
Trademark
SILSTAR
Origin
Jiangyin City Jiangsu Province
HS Code
84778000

Product Description

 

Product Description


Features:
This machine is special for production three or four folded flat and T-shirt bag. It is suitable for PE material etc. There are such features as photocell automatic tracking, blank/color bag-making shift, microcomputer length setting, automatic counting, automatic alarm when reach number, automatic temperature control and loading film by air cylinder.
Machine Brand: SILSTAR

Center Fold T-Shirt Bag Making Machine

 

Product Parameters

Model GBZD-600
Bag making width 300-650mm
Bag making length 700-1200mm
Bag making speed 20-60 pcs/minute
Bag making thickness 0.012-0.10mm
Main motor 1.1kw
Heating 5kw
Total power 16kw
Total weight 1800kg

Detailed Photos

Center Fold T-Shirt Bag Making Machine
Center Fold T-Shirt Bag Making Machine
Center Fold T-Shirt Bag Making Machine

Company Profile

Center Fold T-Shirt Bag Making Machine
Silstar machinery founded in 1997, covers an area of 32,000 m2,we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, and 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.

SILSTAR workshop pictures:

Center Fold T-Shirt Bag Making Machine

Certifications

Center Fold T-Shirt Bag Making Machine
Center Fold T-Shirt Bag Making Machine
Center Fold T-Shirt Bag Making Machine

 

Packaging & Shipping

Center Fold T-Shirt Bag Making Machine

 

Exhibition

Center Fold T-Shirt Bag Making Machine

FAQ

1. Q: How long will your engineer reach our factory?

A: Within 7-15 days after the machine arrives at your factory.
2. Q: How many days will you finish installing?

A: We will finish installation and training within 3-7 days.
3. Q: What should we charge for your engineer?

A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person.
4. Q: How long is your machine's warranty period?

A: All our machines have one year guarantee, starting from the finished installation.
5. Q: How could we do after one year warranty period?

A: We also can do service for you, but you need to pay the salary for my technician 100USD/day.
6. Q: How could we do if the parts are broken within the warranty?

A: We would express the free replacement parts during the warranty date.
7. Q: Does your engineer understand English?

A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience.
8. Q: How many workers do we need to run those machines?

A: Usually need one person to operate the machine.
9. Q: How do we solve the machine problem after your engineer leaves?

A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description.
10. Q: How can I visit your company?

A: It takes 30 minutes by train from Shanghai to our factory.

 

Send your message to this supplier

*From:
*To:
avatar Ms. Linda Wang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now