• Overlap Interleaf Drawstring Garbage Bag Making Machine
  • Overlap Interleaf Drawstring Garbage Bag Making Machine
  • Overlap Interleaf Drawstring Garbage Bag Making Machine
  • Overlap Interleaf Drawstring Garbage Bag Making Machine
  • Overlap Interleaf Drawstring Garbage Bag Making Machine
  • Overlap Interleaf Drawstring Garbage Bag Making Machine

Overlap Interleaf Drawstring Garbage Bag Making Machine

Warranty: 1 Year
Packaging: Bag
Automatic Grade: Automatic
Packaging Material: Film
Application: Garbage Bag
Usage: Making Garbage Bag
Customization:
Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Company Profile
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Certifications
  • Packaging & Shipping
  • Exhibition
  • FAQ
Overview

Basic Info.

Model NO.
GBBCR-1000 III
Type
Plastic Bag Making Machine
Material Type
PE
Machine Inverter Brand
Made in Taiwan
Temperature Controller
Made in Taiwan
Servo Motor
Made in Taiwan
After-Sale Service Provided
Engineers Available to Service Machinery Overseas
Material
HDPE,LDPE
Guarantee
One Year
Machine Control
PLC ,Touch Screen
Machine Brand
Silstar
Transport Package
Wrapping Film Packing or Packed in Wooden Case
Specification
CE, ISO9001: 2008, SGS, TUV
Trademark
SILSTAR
Origin
Made in China
HS Code
84778000

Product Description

 

Company Profile

Overlap Interleaf Drawstring Garbage Bag Making Machine
Silstar machinery founded in 1997, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. Our products including:

1.Plastic T-shirt Bag Making Machine
2.Vegetable Bag on Roll Making Machine With Core
3.Garbage Bag Making Machine Coreless
4.Draw Tape Garbage Bag on Roll Making Machine
5.Plastic Film Blowing Machine

There are more than 54 countries and regions cooperating with us, such as Malaysia, Russia, Iran, Saudi Arabia, Peru, Algeria, Vietnam, India, Romania, America, etc.

Product Description

1. Main control panel adopts touch screen Delta from Taiwan, high definition

2. The drive system of the whole machine adopts PLC Microcomputer control (Single Chip control system ) on the punch machine which integrates control of bag making part and punching part.

3. Set all functions with one touch screen, simple and easy operation.

4. Machine will automatically stop if film jammed which is detected by the sensor

5. Independent winder part, high efficient unwind control; max diameter of single unwinding is 800mm; unwinding roller is choked by air shaft,

6. Automatic fold function and put on conveyor unit by unit.

7. Automatic stacks the bag and collects.

8. When the bags stack at the Set numerical, mechanical hands will automatically grab bags and the machine will not stop.) on punch machine which integrates control of bag making part and punching part.
Overlap Interleaf Drawstring Garbage Bag Making Machine

 

Product Parameters

 
Bag Width 1000 mm
Bag Length 900 mm
Film thickness 10-50 µm per layer
Unwinder Film Size 1000mm x Φ 600mm
Bag making Speed 150 m/min
Roll Change Speed Max. 10 pcs
Width of Draw Tape 100 mm
Draw Tape Roll Diameter 600 mm
Roll Width 300 mm
Roll Diameter Φ 150 mm
Total Power 25 KW
Air consumption 5HP
Machine Weight 3800KG
Machine Dimension L15000*W2000*H2100 mm

Detailed Photos

Overlap Interleaf Drawstring Garbage Bag Making Machine
Overlap Interleaf Drawstring Garbage Bag Making Machine
Overlap Interleaf Drawstring Garbage Bag Making Machine

 

Certifications

Overlap Interleaf Drawstring Garbage Bag Making Machine
Overlap Interleaf Drawstring Garbage Bag Making Machine
Overlap Interleaf Drawstring Garbage Bag Making Machine

 

Packaging & Shipping

Overlap Interleaf Drawstring Garbage Bag Making Machine

 

Exhibition

Overlap Interleaf Drawstring Garbage Bag Making Machine

FAQ

1. Q: How long will your engineer reach our factory?

A: Within 7-15 days after the machine arrives at your factory.
2. Q: How many days will you finish installing?

A: We will finish installation and training within 3-7 days.
3. Q: What should we charge for your engineer?

A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person.
4. Q: How long is your machine's warranty period?

A: All our machines have one year guarantee, starting from the finished installation.
5. Q: How could we do after one year warranty period?

A: We also can do service for you, but you need to pay the salary for my technician 100USD/day.
6. Q: How could we do if the parts are broken within the warranty?

A: We would express the free replacement parts during the warranty date.
7. Q: Does your engineer understand English?

A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience.
8. Q: How many workers do we need to run those machines?

A: Usually need one person to operate the machine.
9. Q: How do we solve the machine problem after your engineer leaves?

A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description.
10. Q: How can I visit your company?

A: It takes 30 minutes by train from Shanghai to our factory.

 
 

Send your message to this supplier

*From:
*To:
avatar Ms. Linda Wang
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now